检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Xin Hou Ji Chen YouQian Liu PengFei Rui JingYi Zhao ShouHong Zhang HaiMing Dang
机构地区:[1]Beiluhe Observation and Research Station of Frozen Soil Engineering and Environment,State Key Laboratory of Frozen Soil Engineering,Northwest Institute of Eco-Environmental and Resources,Chinese Academy of Sciences,Lanzhou,Gansu 730000,China [2]University of Chinese Academy of Sciences,Beijing 100049,China [3]China Railway Qinghai-Tibet Group Co.Ltd,Xining,Qinghai 810007,China
出 处:《Research in Cold and Arid Regions》2023年第1期18-26,共9页寒旱区科学(英文版)
基 金:supported by the Natural Science Foundation of China (Grants No.41101065);the State Key Laboratory of Frozen Soil Engineering Funds (SKLFSE-ZT-34,SKLFSE-ZQ-202103).
摘 要:The bearing capacity of pile foundations is affected by the temperature of the frozen soil around pile foundations.The construction process and the hydration heat of cast-in-place(CIP)pile foundations affect the thermal stability of permafrost.In this paper,temperature data from inside multiple CIP piles,borehole observations of ground thermal status adjacent to the foundations and local weather stations were monitored in warm permafrost regions to study the thermal influence process of CIP pile foundations.The following conclusions are drawn from the field observation data.(1)The early temperature change process of different CIP piles is different,and the differences gradually diminish over time.(2)The initial concrete temperature is linearly related with the air temperature,net radiation and wind speed within 1 h before the completion of concrete pouring;the contributions of the air temperature,net radiation,and wind speed to the initial concrete temperature are 51.9%,20.3%and 27.9%,respectively.(3)The outer boundary of the thermal disturbance annulus is approximately 2 m away from the pile center.It took more than 224 days for the soil around the CIP piles to return to the natural permafrost temperature at the study site.
关 键 词:PERMAFROST Cast-in-place pile foundations Thermal disturbance Freezeback process Initial concrete temperature
分 类 号:P642.14[天文地球—工程地质学] U213.14[天文地球—地质矿产勘探] U416.168[天文地球—地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15