检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘心怡 徐鹏 朱孟兰 黄瑞 LIU Xinyi;XU Peng;ZHU Menglan;HUANG Rui(POWERCHINA Guiyang Engineering Corporation Limited,Guiyang 550081,Guizhou,China)
机构地区:[1]中国电建集团贵阳勘测设计研究院有限公司,贵州贵阳550081
出 处:《工程技术研究》2023年第12期8-10,共3页Engineering and Technological Research
基 金:中国电建贵阳院重大科研项目“工程时空信息与协同设计关键技术研究”(YJZD2020-01)。
摘 要:大中型工程项目具有占地面积大、规划选址难、设计施工复杂、运维管理维度广等特点,存在规划阶段叠规分析难、设计阶段BIM缺乏宏观影响分析、专业协同设计难、运维数字化较低等问题。对此,文章提出基于GIS+BIM的工程全生命周期三维映射平台体系,以三维GIS引擎为基础,构建三维映射基底,并融合多元异构数据,集成GIS时空数据分析与参数化建模,实现了宏观与微观的多层次信息融合,助力大中型工程在规划、设计、施工、运维等阶段三维映射应用成果数据价值的最大化,为拓宽工程全生命周期数字孪生应用广度和深度提供了一种新思路。Large and medium-sized engineering projects have the characteristics of large area,difficult planning and site selection,complex design and construction,and wide dimension of operation and maintenance management.There are some problems such as difficulty in specification overlapping analysis in planning stage,lack of macro influence analysis of BIM in design stage,difficulty in professional collaborative design,and low digitization of operation and maintenance.In this regard,a GIS+BIM based 3D mapping platform system for the full life cycle of the engineering is proposed.Based on the 3D GIS engine,a 3D mapping base is constructed,and multi-heterogeneous data are fused to integrate GIS spatiotemporal data analysis and parametric modeling.The multi-level macro and micro information fusion is realized,which can help to maximize the value of 3D mapping application results in the planning,design,construction,operation and maintenance stages of large and medium-sized engineering,providing a new idea for broadening the breadth and depth of digital twin application in the full life cycle of the engineering.
关 键 词:GIS+BIM 三维映射 工程全生命周期 时空分析
分 类 号:TM935.3[电气工程—电力电子与电力传动]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38