综放工作面过厚夹矸放炮技术应用  

Application of Blasting Technology for Crossing Thick Dirt Band in Fully-mechanized Top Coal Caving Face

在线阅读下载全文

作  者:刘耀辉 LIU Yaohui(Buertai Coal Mine,Shendong Coal Group,CHN Energy,Ordos 017000,Inner Mongolia,China)

机构地区:[1]国能神东煤炭布尔台煤矿,内蒙古鄂尔多斯017000

出  处:《能源与节能》2023年第8期82-84,153,共4页Energy and Energy Conservation

摘  要:为了解决布尔台煤矿12上301综放工作面过厚矸石顶板的问题,对301辅运顺槽实施深孔预裂爆破方案,对目标55 m区域1.4~2.1 m厚的矸石进行爆破施工。根据矸石的厚度,将装药段长度分别设置为10 m,12 m,6 m。工程应用中,支架阻力处于正常稳定范围,放顶煤过程中矸石顺利放出,证明了预裂爆破方案的可行性。In order to solve the problem in crossing thick dirt band roof in No.12 up 301 fully-mechanized top coal caving face of Buertai Coal Mine,the 301 auxiliary transportation chute was used for deep hole presplitting blasting,and the gangue with thickness of 1.4-2.1 m in the target 55 m area was blasted.According to the thickness of the gangue,the length of the charging section was set to 10 m,12 m,and 6 m.In the engineering application,the support resistance was in the normal and stable range,and the gangue was discharged smoothly during the caving process,which proved the feasibility of presplitting blasting scheme.

关 键 词:深孔预裂爆破 支架阻力 放顶煤 

分 类 号:TD235.33[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象