检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王中[1,2] 赵士桢 郑拓[1,2] Wang Zhong;Zhao Shizhen;Zheng Tuo(Shanghai Institute of Measurement and Testing Technology,Shanghai Key Laboratory of Online Test and Control Technology)
机构地区:[1]上海市计量测试技术研究院 [2]上海市在线检测与控制技术重点实验室
出 处:《上海计量测试》2023年第3期2-5,共4页Shanghai Measurement and Testing
基 金:上海市市场监督管理局科技计划项目(2022-10)。
摘 要:通过对PWM方波导致电磁辐射发射问题的机理进行分析,结合一款PWM控制的流量输出调节系统进行实验验证。结果表明,PWM方波边沿时间在0.01~100μs范围内,对流量输出调节系统在0.1~5 MHz范围内的辐射发射场强幅值影响较大,在100 kHz处最大差异超过30 dB。PWM方波电压幅值在5~16 V范围内,流量输出调节系统的辐射发射场强幅值没有受到明显的影响。通过研究,为涉及PWM控制产品的电磁兼容设计、整改优化等提供理论和技术支撑。The problem was analyzed that the near-field radiation disturbance caused by PWM signal,and verification was carried out with a pump regulation system controlled by PWM.When the PWM edgetime was within 10 ns and 100μs,there was significant difference of peak and average amplitude within 0.1-5 MHz,even more than 30 dB at 100 kHz;whereas there was no significant difference of Vtop amplitude within 5 V and 16 V.It may provide theoretical and technical support for EMC design and optimization.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49