作 者:郭廷 GUO Ting(Guangdong Hydropower Planning&Design Institute Co.,Ltd.,Guangzhou 510635,China)
机构地区:[1]广东省水利电力勘测设计研究院有限公司,广州510635
出 处:《广东水利水电》2023年第8期72-76,共5页Guangdong Water Resources and Hydropower
摘 要:文章通过对广东水文能力提升工程(一期)的建设目标、要求和内容进行深入分析,结合相关规范条文和工程实际情况,在观测房结构设计、测井井身支撑形式、进水方式等方面开展研究分析,重点对工程新建和改建的14个自记台进行“一站一策”全面设计,为后续工作奠定了坚实的基础,可为类似工程提供借鉴参考。In this study,the construction objectives,requirements and contents of the Guangdong Hydrological Capacity Improvement Project(Phase I)was analyzed thoroughly.Combined with the relevant specifications and specific conditions,the hydrological self-recording station was designed according to structural design of the observation room,the support form of the logging well body,the way of water inflow,and so on.There were 14 self-recording stations in the Phase I that need to be built or rebuilt,and the design of each station needs to be combined with the actual situation of the station.The design of stations lay a solid foundation for the future work and provide reference for similar projects.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.23.61.129