检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:唐建 高强 TANG Jian;GAO Qiang(Sinohydro Bureau 10 Co.,Ltd.,Chengdu Sichuan 610036)
机构地区:[1]中国水利水电第十工程局有限公司,四川成都610036
出 处:《四川水力发电》2023年第4期50-54,共5页Sichuan Hydropower
摘 要:项目合同本身就是法律文件,合同中的所有条款都是合同各方必须严格遵守、自觉履行的法律责任。合同各方对合同条款的正确解读和使用不仅考验承包商是否能够充分利用合同来维护自身合法权益的能力,更是考验承包商是不是有经验的承包商。以印度尼西亚巴塘项目充分利用合同条款,合理合法的修正因业主根据其自己对合同的片面理解,并炮制的所谓“双监理”机制的实例,探讨了正确解读和使用合同条款的重要性,以及敢于向业主有理有据“亮剑”的精神。The contract itself is a legal document,and all the terms in the contract are legal responsibilities that all parties to the contract must strictly abide by and consciously perform.The correct interpretation and use of the terms of the contract by the parties to the contract not only tests whether the contractor can make full use of the contract to protect its legitimate rights and interests,but also tests whether the contractor is an experienced contractor.Taking full advantage of reasonable and legal amendments to the contract terms in the Batang Project in Indonesia,this paper exposes that the so-called"double supervision"mechanism was concocted by the owner based on his own one-sided understanding of the contract,and celebrates the spirit of resistance.
关 键 词:国际工程 EPC合同 业主工程师(EE) 承包商工程师(CE) 业主代表(ER) 合同管理模式 巴塘项目
分 类 号:TV7[水利工程—水利水电工程] TV51
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7