检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李超 LI Chao(Sinohydro Bureau 10 Co.,Ltd.,Chengdu Sichuan 610036)
机构地区:[1]中国水利水电第十工程局有限公司,四川成都610036
出 处:《四川水力发电》2023年第4期59-62,共4页Sichuan Hydropower
摘 要:针对塔吉克斯坦北阿尔登-托普坎铅锌矿区8-2中段1-2b上斜分层多空区复杂条件下1-2b矿体残矿的回采,采用中深孔爆破技术,利用底部采场空区作为自由面、底部采场形成的采准工程,研究出科学合理的回采措施并予以实施,解决了复杂多空区的安全隐患,实现了1-2b矿体残矿安全回收,所取得的经验可为今后类似情况的残矿回采提供参考。Aiming at the stoping of 1-2b residual ore and ore body under complex multi goaf area in the 8-2 middle section of the North Alden-Topkan Lead-Zinc Mining Area in Tajikistan,the medium deep hole blasting technology is carried out,using the bottom goaf as the free surface and bottom goaf to form a mining access route.The scientific and reasonable mining measures have solved the hidden danger of the complex multi goaf area and achieved the stoping residual ore of 1-2b Orebody,providing reference for residual ore stoping in similar situations in the future.
关 键 词:塔吉克斯坦 多空区 残矿回采 回采措施 阿尔登-托普坎铅锌矿区
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49