提高水电站600 MPa级高强钢钢管制造安装质量  被引量:1

Quality Improving of the Manufacturing and Installation of 600 MPa Grade High Strength Penstocks in the Hydropower Station

在线阅读下载全文

作  者:李万有 杨小军[2] LI Wanyou;YANG Xiaojun(Tianquan Branch,Datang Ya'an Electric Power Development Co.,Ltd.,Ya'an Sichuan 625500;Sichuan Ertan International Engineering Consulting Co.,Ltd.,Chengdu Sichuan 611132)

机构地区:[1]大唐雅安电力开发有限公司,四川雅安625500 [2]四川二滩国际工程咨询有限责任公司,四川成都611132

出  处:《四川水力发电》2023年第4期94-99,共6页Sichuan Hydropower

摘  要:根据锅浪跷水电站引水系统压力钢管存在洞内有限空间作业、积水严重且工期紧张等实际情况,采取了埋弧焊接、改变探伤及试验方式等措施,确保了施工进度及质量。锅浪跷水电站引水系统压力钢管制造安装质量控制的成果,可供同行借鉴参考。According to the fact that the penstock of the water diversion system of Guolangqiao Hydropower Station has limited space operation in the tunnel,severe water accumulation and tight construction period,measures such as submerged arc welding,changing flaw detection and test methods have been taken to ensure the construction progress and quality.The quality control results of the penstock manufacturing and installation of the diversion system of Guolangqiao Hydropower Station can provide a reference for similar projects.

关 键 词:水电站 压力钢管 制造安装 质量控制 

分 类 号:TM622[电气工程—电力系统及自动化] TV547.2[水利工程—水利水电工程] O213.1[理学—概率论与数理统计]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象