检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邵小刚 彭辉 秦彬峰 SHAO Xiao-gang;PENG Hui;QIN Bin-feng(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
机构地区:[1]中国水利水电第十四工程局有限公司,云南昆明650041
出 处:《云南水力发电》2023年第8期119-123,共5页Yunnan Water Power
摘 要:在水利工程施工中,围堰技术并非简单的工艺,黄河主河道填筑大型纵向围堰在国内的实施案例较少,通过提升水下地形测量的准确性及可操作性、动水中进占体抛投料物计算、土石围堰中高压旋喷防渗墙区域细粒料填筑、围堰迎水面抗冲刷的技术研究,形成一套完整的主河道纵向围堰施工技术。In water conservancy project construction,cofferdam technology is not a simple process.There are few implementation cases of large-scale longitudinal cofferdams in the main Yellow River channel in China.A complete set of longitudinal cofferdam construction techniques for the main river has been formed by improving the accuracy and operability of underwater terrain measurement,calculating the amount of materials thrown into the moving water,filling the high-pressure rotary jet anti-seepage wall area with fine particles in the earth-rock cofferdam,and researching the anti erosion technology of the upstream surface of the cofferdam.
关 键 词:水下测量 抛石进占体 土石围堰 材料计算 渗流计算
分 类 号:TV551.3[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.133.122.6