检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:彭峰 黄胜 李团 PENGFeng;HUANG Sheng;LI Tuan(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
机构地区:[1]中国水利水电第十四工程局有限公司,云南昆明650041
出 处:《云南水力发电》2023年第8期223-227,共5页Yunnan Water Power
摘 要:伴随着科技水平的提高,竖井施工工艺流程不断完善,机械化程度也在不断提高,伴随而来便是施工过程中存在的各种安全风险。企业在追求效益、进度及质量的同时,也必须高度重视施工安全的控制。施工企业要努力加强自身的安全生产管理水平,提高和强化安全防范意识,并针对可能造成安全问题的各种因素,采取相关的措施进行防范。对竖井施工主要安全管理措施进行分享,通过在竖井施工过程中对提升设备的布设、施工工艺流程的完善、安全管理措施的实施,从难易简。With the improvement of scientific and technological level,the shaft construction process has been continuously improved,and the degree of mechanization has also been continuously improved.It is accompanied by various safety risks in the construction process.While pursuing efficiency,progress and quality,enterprises must also attach great importance to the control of construction safety.Construction enterprises should strive to strengthen their own safety production management level,improve and strengthen safety prevention awareness,and take relevant measures to prevent various factors that may cause safety problems.This paper shares the main safety management measures for shaft construction.Through the layout of lifting equipment,the improvement of construction process and the implementation of safety management measures in the process of shaft construction,it is difficult to simplify.
关 键 词:竖井施工 安全管理措施 双重预防机制建设 提升设备检测
分 类 号:TU714[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.188.252.203