检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王超 杨小龙 朱国金 司建强 WANG Chao;YANG Xiao-long;ZHU Guo-jin;SI Jian-qiang(Power China Kunming Engineering Corporation Limited,Kunming 650051,China)
机构地区:[1]中国电建集团昆明勘测设计研究院有限公司,云南昆明650051
出 处:《云南水力发电》2023年第8期348-352,共5页Yunnan Water Power
摘 要:滇中引水工程观音山倒虹吸长达9.8 km,输水流量达100 m^(3)/s,采用3根4.2 m内径的压力钢管输水。在满足输水流量的同时需要保证倒虹吸进口一定的淹没深度,避免进口掺气等不利水力现象。为简化调度运行提出不同输水通道数匹配输水流量级别、节制闸与溢流堰联合控制的方式,实现出口节制闸仅全开或全关两种运行状态。Guanyinshan inverted siphon of Central Yunnan Water Diversion Project is 9.8 km long,with a water conveyance flow of 100 m^(3)/s.The inverted siphon is composed of three 4.2 m inner diameter steel penstocks.While meeting the water delivery flow,it is necessary to ensure a certain submergence depth at the inverted siphon inlet to avoid adverse hydraulic phenomena such as aeration.This paper proposed that different number of conduits match different delivery flow,and the joint control of the sluice and overflow weir,to realize the two operation states of the outlet sluice:fully open or fully closed.
关 键 词:滇中引水工程 多通道倒虹吸 分级运行 堰闸组合 水力控制
分 类 号:TV222[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.59.134.12