检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:康启宇 KANG Qiyu(Xi’an Chang’an Infrastructure Construction Co.Ltd.,Xi’an Shaanxi 710100)
机构地区:[1]西安市长安基础建设有限责任公司,陕西西安710100
出 处:《环境卫生工程》2023年第4期52-56,共5页Environmental Sanitation Engineering
摘 要:“薄层-线性”二段法污泥干化工艺具有高干出泥(含水率10%~30%)、安全(氧含量<5%)、水分蒸发效率高、设备投资低、运行稳定等特点。介绍了处理量1 442.5 t/d的我国某大型市政污泥处理处置扩建工程的工艺流程、核心设备、工艺设计和调试运行情况,该工程共设10条“薄层-线性”二段法污泥干化线,进泥含水率78%~82%,出泥含水率可达20%~33%,各项性能考核指标和能耗指标均达标。Two-stage sludge drying process by thin film dryer and linear dryer had features of high dry sludge yield(moisture content 10%~30%),safety(oxygen content5%),high water evaporation efficiency,low equipment investment,stable operation and so on.The process flow,core equipment,process design and commissioning operation of a large-scale domestic municipal sludge treatment and disposal project with a capacity of 1 442.5 t/d was introduced.The project was equipped with 10 two-stage sludge drying lines,and the moisture content of feeding sludge was 78%~82%,the outgoing sludge moisture content could reach to 20%~33%.All performance assessment index and energy consumption index were up to standard.
分 类 号:X703[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15