明挖地铁车站建设期温室气体排放研究——以深圳市城市轨道交通12号线某车站为例  被引量:2

Greenhouse Gas Emissions of Open-Cut Metro Station in Construction Phase:A Case Study of a Metro Station on Shenzhen Urban Rail Transit Line 12

在线阅读下载全文

作  者:陈坤阳 陈湘生[1,2,3] 王雷 阳文胜[4] 吴环宇[1,2] 段华波 CHEN Kunyang;CHEN Xiangsheng;WANG Lei;YANG Wensheng;WU Huanyu;DUAN Huanbo(College of Civil and Transportation Engineering,Underground Polis Academy,Shenzhen University,Shenzhen 518061,Guangdong,China;Key Laboratory for Resilient Infrastructures of Coastal Cities,Ministry of Education,Shenzhen University,Shenzhen 518060,Guangdong,China;Shenzhen Key Laboratory of Green,Efficient and Intelligent Construction of Underground Metro Station,Shenzhen University,Shenzhen,Shenzhen 518060,Guangdong,China;Shenzhen Municipal Design&Research Co.,Ltd.,Shenzhen 518029,Guangdong,China;School of Environmental Science and Engineering,Huazhong University of Science and Technology,Wuhan 430074,Hubei,China)

机构地区:[1]深圳大学土木与交通工程学院,未来地下城市研究院,广东深圳518061 [2]滨海城市韧性基础设施教育部重点实验室(深圳大学),广东深圳518060 [3]深圳市地铁地下车站绿色高效智能建造重点实验室,广东深圳518060 [4]深圳市市政设计研究院有限公司,广东深圳518029 [5]华中科技大学环境科学与工程学院,湖北武汉430074

出  处:《隧道建设(中英文)》2023年第S01期189-197,共9页Tunnel Construction

基  金:国家自然科学基金项目(51938008,52090084);深圳市科创委基础研究项目(JCYJ20190808123013260);中国工程院战略研究与咨询项目(2022-DFZD-18)。

摘  要:为合理量化明挖地铁车站建设期温室气体(GHG)排放强度及水平,基于LCA方法,开展明挖地铁车站建设期GHG排放评价工作,建立明挖车站建设期GHG排放核算公式,并结合实际工程数据进行GHG排放强度与水平的定量化分析。研究结果表明:案例明挖地铁车站建设期的GHG排放总量为47718.61 tCO_(2)e。其中,建材生产、运输和施工阶段分别占比88.91%、3.92%和7.12%;明挖地铁车站建设期的GHG排放强度为335.52 tCO_(2)e/100 m^(2)。研究结果可为促进城市交通运输领域的绿色低碳转型提供理论基础。To reasonably quantify the greenhouse gas(GHG)emission intensity and level of open-cut metro station construction,life cycle assessment method is adopted to conduct GHG emission assessment of open-cut metro station in the construction phase.In addition,a GHG emission calculation formula for open-cut metro station in the construction phase is established,and GHG emission intensity and level are quantitatively analyzed in case studies.The research results show that the total GHG emissions of the case open-cut metro station in the construction phase are 47718.61 tCO_(2) e.Among them,the production,transportation,and construction of building materials account for 88.91%,3.92%,and 7.12%,respectively.The GHG emission intensity in the construction phase of the open-cut metro station is 335.52 tCO_(2) e/100 m^(2).The research results can provide a theoretical basis for promoting the green and low-carbon transformation in the field of urban transport.

关 键 词:明挖地铁车站 生命周期评价 温室气体排放 

分 类 号:U45[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象