锡槽底砖施工过程及要点  

Construction Process and Key Points of Tin Bath Bottom Blocks

在线阅读下载全文

作  者:刘勇[1] 周祥[1] 丁奇亮[1] LIU Yong;ZHOU Xiang;DING Qi-liang(China Triumph International Engineering Co,Ltd,Shanghai 200063,China)

机构地区:[1]中国建材国际工程集团有限公司,上海200063

出  处:《建材世界》2023年第4期71-73,共3页The World of Building Materials

摘  要:锡槽是浮法玻璃生产的三大热工设备之一,其施工的好坏直接关系到后期是否能顺利生产,而锡槽底砖施工又是整个锡槽本体施工中最为关键部分。从底砖的排布、胀缝的留设、螺柱的焊接到辅材的填充,每一步都极为关键,务必保证按规范实施。Tin bath is one of the three major thermal equipment for float glass production,the quality of its construction is directly related to whether the glass can be successfully produced in the later period,and the construction of tin bath bottom blocks is the most critical part of the entire tin bath body construction.From the arrangement of the bottom blocks,the expansion of the joints,the welding of the studs to the filling of the auxiliary material,each step is extremely critical and must ensure that it is implemented according to the specification.

关 键 词:浮法玻璃 底砖排布 胀缝留设 螺柱焊接 辅材填充 

分 类 号:TQ171.6[化学工程—玻璃工业]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象