检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘栋 LIU Dong(School of Law,Shandong Jianzhu University,Jinan 250101,China)
出 处:《建筑设计管理》2023年第6期56-63,共8页Architectural Design Management
摘 要:"烂尾楼"工程涉及多方利益和占用大量的资源,事关社会稳定与金融安全,复工续建利大于弊,解决好"烂尾楼"工程的复工续建具有现实的意义。但复工续建过程中面临着引入资金困难、工程所涉法律关系复杂、各方主体难以协调和续建过程难以管理等难题。文章通过研究积极探索多元融资模式、理清法律关系和清偿顺位、推进府院联动、各方协调和加强管理人的选任和监管等方法破解"烂尾楼"工程的拯救难题,减少"烂尾楼"工程对社会、经济造成的负面冲击。"Unfinished building" projects involve multiple stakeholders,occupy huge resources,and relate to social stability and financial security.The advantages outweigh the disadvantages in resuming construction of "unfinished building" projects,the proper handling of which is of practical significance.However,there are tricky problems such as difficult financing,complex legal relations involved in projects,difficulty in coordinating all participants,and trouble managing the process of continuing with construction in the process of resuming construction.This paper tackled tricky problems in saving "unfinished building" projects by studying methods such as actively exploring diversified models of financing,straightening out legal relations and the order of liquidation,promoting collaboration between the government and the court of law,coordination of all parties,and strengthening the selection,appointment and supervision of managers,to reduce negative impacts of "unfinished building" projects on society and economy.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49