广西水资源监控能力建设二期项目运行维护实践  

Operation and maintenance practice of Guangxi Water Resources Monitoring Capacity Construction Phase II Project

在线阅读下载全文

作  者:黄文浦 李俊林[2] HUANG Wen-pu;LI Jun-lin(Guangxi Water Resources Management Service Center,Nanning 530023,China;Guangxi Water&Power Design Institute Co.,Ltd.,Nanning 530023,China)

机构地区:[1]广西壮族自治区水资源管理服务中心,南宁530023 [2]广西水利电力勘测设计研究院有限责任公司,南宁530023

出  处:《广西水利水电》2023年第4期123-125,共3页Guangxi Water Resources & Hydropower Engineering

摘  要:2021年,国家水资源监控能力建设广西二期项目完成全部建设任务正式投入运行,有效改善了广西水资源监控手段缺乏、取水计量在线率偏低的问题。项目建成投入使用后,如何确保项目良性运行,持续发挥监控效益成为重要问题,本文通过分析2022年项目取用水监测站群的运行状况,提出运行维护主要对策。As one of the components of National Water Resources Monitoring Capacity Construction Project,the Guangxi Water Resources Monitoring Capacity Construction Phase II Project was completed and officially put into operation in 2021,effectively improving the situation of lack of water resources monitoring means and low online rate of water intake metering in Guangxi.After the project is completed and put into use,how to ensure the healthy operation of the project and continuously bring into play the monitoring benefits has become an important issue.Based on analysis of the operation status of the water intake monitoring station group in 2022,countermeasures for operation and maintenance are put forward.

关 键 词:水资源监控 取用水监测 运行维护 运行数据分析 

分 类 号:TV213.4[水利工程—水文学及水资源]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象