检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:柴晋平 陈涛 李兴春 CHAI Jin-ping;CHEN Tao;LI Xing-chun(Shanxi Wanjiazhai Water Control Water Resources Co.,Ltd.,Taiyuan,Shanxi 650213,China)
机构地区:[1]山西万家寨水控水资源有限公司,山西太原030012
出 处:《水电站机电技术》2023年第8期1-4,9,139,共6页Mechanical & Electrical Technique of Hydropower Station
摘 要:通过对万家寨引黄工程梯级泵站运行中影响泵站用电量较大的机组、变频器等的深入研究,从泵站能源单耗入手,以单方水耗电量为切入点,推导出尽可能降低总一、总二泵站的扬程和机组定速运行是降低万家寨引黄工程泵站运行能耗的关键因素,并在实践中得以验证。这一结论可以对类似泵站的经济运行提供借鉴和参考。Through our in-depth research on the units,frequency converters,and other factors that have a significant impact on the power consumption of the cascade pumping stations in the Wanjiazhai Yellow River Diversion Project,starting from the energy consumption of the pumping stations,taking the power consumption per cubic meter of water as the starting point,it is deduced that reducing the head and unit speed operation of the first and second pumping stations as much as possible is the key factor in reducing the energy consumption of the pumping stations in the Wanjiazhai Yellow River Diversion Project,and has been verified in practice.This conclusion can provide reference and reference for the economic operation of similar pumping stations.
分 类 号:TV675[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49