检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张应超 周伟鹏 ZHANG Ying-chao;ZHOU Wei-peng(China Water Resources and Hydropower 11th Engineering Bureau Co.,Ltd.,Zhengzhou,Henan 623500)
机构地区:[1]中国水利水电第十一工程局有限公司,河南郑州450000
出 处:《水电站机电技术》2023年第8期109-112,139,共5页Mechanical & Electrical Technique of Hydropower Station
摘 要:对多泥沙河流的径流式水电站汛期运行、排沙避沙技术进行了论述,通过电站来水含沙情况调查分析,提出一整套冲沙闸合理排泄、沉砂池引水渠清理、避开特定时段发电等运行技术及实施措施,有效减少泥沙淤积、机组过流泥沙含量,保障汛期电站的安全运行及发电指标。This paper discusses the operationduring the flood season and sediment avoidance operation techniques of run-of-river hydropower stations in sediment-laden rivers.Through investigation and analysis of the sediment concentration in the incoming water of the power station,a complete set of operation technologies and implementation measures such as reasonable discharge of sediment sluices,cleaning of the diversion channel of the sedimentation tank,and avoiding specific periods of power generation are proposed.These measures effectively reduce sediment deposition and the sediment content of the unit flow,ensuring the safe operation and power generation indicators of the power station during the flood season.
分 类 号:TV747[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49