检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘汉凌 杨莉[1] 方蕾 LIU Hanling;YANG Li;FANG Lei(Hubei Huaxia Water Conservancy and Hydropower Co.,Ltd.,Jingzhou 434000,China)
机构地区:[1]湖北华夏水利水电股份有限公司,湖北荆州434000
出 处:《中国水能及电气化》2023年第8期28-33,共6页China Water Power & Electrification
摘 要:水工建筑物固定卷扬式启闭机多采用二期混凝土浇筑方法进行安装,为提高安装效率、缩短安装工期,本文对固定卷扬式启闭机基座预埋锚板安装方法进行了研究,该方法在多个水利工程启闭机安装工程中通过实践应用,具有安装操作简单、安装精度高、节约工期等优点。Installation of fixed winch-type gate hoists in hydraulic structures often adopts the two-stage concrete pouring method.In order to improve installation efficiency and shorten the installation period,this paper studies the installation method of embedding anchor plates in the foundation of fixed winch-type gate hoists.This method has been practically applied in multiple water control projects,demonstrating advantages such as simple installation procedures,high installation accuracy,and time savings.
分 类 号:TV547.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200