检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈永波 CHEN Yongbo(South-to-North Water Diversion Project Jiangsu Pumping Station Technology Co.,Ltd.,Yangzhou 225000,China)
机构地区:[1]南水北调江苏泵站技术有限公司,江苏扬州225000
出 处:《中国水能及电气化》2023年第8期34-38,共5页China Water Power & Electrification
摘 要:前柳林泵站机组手动操作停机时,出现无法及时打开真空破坏阀的现象,导致机组倒转时间较长,影响机组安全。为解决这种弊端,文章在现有的控制回路中增加一个中间继电器和一个时间继电器,并增设上下限位行程开关接入控制回路,调整时间继电器的动作时间,可以控制真空破坏阀的打开时间,从而满足机组完成停机所需的时间,此问题的解决思路和设想,对同类虹吸式泵站工程运行出现类似情况时可提供参考。During manual shutdown of the units at Qianliulin Pumping Station,a phenomenon has been observed where the vacuum breaker fails to open promptly,resulting in prolonged unit reversal time and compromising unit safety.To address this issue,this paper proposes the addition of an intermediate relay and a time relay to the existing control circuit.Furthermore,the inclusion of upper and lower limit travel switches in the control circuit is suggested.By adjusting the operation time of the time relay,the opening time of the vacuum breaker can be controlled,thus ensuring that the units complete the shutdown within the required timeframe.The proposed solution and conceptual approach serve as reference for similar situations encountered during the operation of similar siphon pump station projects.
分 类 号:TV675[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49