一种水轮发电机定子槽楔更换优化方法  被引量:1

An Optimization Method for Replacing the Stator Slot Wedge of Hydrogenerators

在线阅读下载全文

作  者:易强 肖智斌 YI Qiang;XIAO Zhibin(Jiangya Hydropower Station,Hunan Lishui Hydro&Power Co.,Ltd.,Zhangjiajie 427221,China)

机构地区:[1]湖南澧水流域水利水电开发有限责任公司江垭水电站,湖南张家界427221

出  处:《长江技术经济》2023年第4期122-126,共5页Technology and Economy of Changjiang

摘  要:水轮发电机组运行期间,定子槽楔出现松动将会减弱其对定子线棒的固定作用,加剧定子线棒振动,长期运行将破坏线棒的主绝缘体,造成磨损与放电,影响发电机安全运行,因而槽楔的松动检测对发电机正常运行具有重要意义。通过分析槽楔松紧度检查方法,根据电厂实际情况选择了铜锤敲击法。在现有槽楔结构基础上,提出了一种发电机定子槽楔更换优化方法,并进行了现场实测,验证了该方法的正确性和可行性。During the operation of hydrogenerator set,the loosening of stator slot wedge will weaken its fixed effect on the stator wire rod and aggravate the vibration of rod.Long-term operation will damage the main insulator of the wire rod,causing wear and discharge that can jeopardize the safe operation of the generator.Hence,it is imperative to detect the loosening of slot wedge to ensure the generator's normal operation.By analyzing methods of checking the slot wedge tightness,we selected the copper hammer tapping method based on the specific circumstance of the power plant.Additionally,we propose an optimized method for replacing the stator slot wedge in line with the existing slot structure.We further conducted field measurements to verify the correctness and feasibility of this approach.

关 键 词:定子槽楔 松动检查 槽楔更换 优化方法 

分 类 号:TM311[电气工程—电机] TV738[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象