检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:申亮 Shen Liang(Shenzhen Special Zone Railway Construction Group Co.,Ltd.,Shenzhen,Guangdong 518034)
机构地区:[1]深圳市特区铁工建设集团有限公司,广东深圳518034
出 处:《现代工程科技》2023年第7期53-56,共4页Modern Engineering Technology
摘 要:施工风险包括自身风险和环境风险两种。将城市地铁小盾构施工所面临的环境风险作为研究的对象,根据国家风险等级及控制标准,对案例工程盾构施工区域内风险源进行了识别,并确定了风险源的风险等级。通过有限元数值模型对各风险源进行了沉降和水平变形模拟分析,提出了可行的控制措施,对本工程盾构施工起到了指导性的作用。Construction risks include self-risk and environmental risk.This paper takes the environmental risks faced by subway shield construction as the research object,and identifies the risk sources in the shield construction area according to national risk levels and control standards,and determines the risk levels of the risk sources.The finite element numerical model was used to simulate the settlement and horizontal deformation of each risk source,and proposed feasible control measures,which played a guiding role in the shield construction of this project.
分 类 号:U455.43[建筑科学—桥梁与隧道工程] U231.3[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7