检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国铁路成都局集团有限公司供电部 [2]中国铁路成都局集团有限公司贵阳供电段
出 处:《电气化铁道》2023年第S01期179-182,共4页Electric Railway
摘 要:随着我国电气化铁路的快速发展和人们出行需求提升,对接触网安全可靠运行的要求也越来越高。当发生突发事故对接触网设备造成破坏,将会给应急抢修工作带来极大的困难。本文就某次应急抢险中对接触网损坏钢柱基础采取的临时措施和恢复方案进行探讨,提出优化基础设计方案建议,为今后出现同类情况提供有益参考。Along with the rapid development of electrified railway in China and increasing of people’s travel demand,the requirements of safe and reliable operation of OCS are becoming higher and higher.When a sudden accident occurs and causes the damage of OCS equipment,it will bring great difficulties to the emergency rescue.The paper discusses the temporary measures and restoration plan adopted for damaged steel mast foundation in an emergency rescue,puts forward proposals on optimization of foundation design,providing useful reference for similar cases in the future.
分 类 号:U226.8[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.36.171