检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘关雄 张杰 杨志全 刘正权[1,2,3] LIU Guanxiong;ZHANG Jie;YANG Zhiquan;LIU Zhengquan(School of Public Safety and Emergency Management,Kunming University of Science and Technology,Kunming 650093,Yunnan,China;Key Laboratory of Geological Hazard Risk Prevention and Emergency Mitigation of Ministry of Emergency Management,Kunming University of Science and Technology,Kunming 650093,Yunnan,China;Key Laboratory of Early Rapid Identification,Prevention and Control of Geological Diseases in Traffic Corridor of High Intensity Earthquake Mountainous Area of Yunnan Province,Kunming 650093,Yunnan,China;Yunnan Institute of Geological Environment Monitoring,Kunming 650216,Yunnan,China;Key Laboratory of Plateau and Mountain Geological Hazard Forecast and Early Warning and Ecological Protection and Restoration,Ministry of Natural Resources,Kunming 650216,Yunnan,China)
机构地区:[1]昆明理工大学公共安全与应急管理学院,云南昆明650093 [2]昆明理工大学应急管理部地质灾害风险防控与应急减灾重点实验室,云南昆明650093 [3]云南省高校高烈度地震山区交通走廊工程地质病害早期快速判识与防控重点实验室,云南昆明650093 [4]云南省地质环境监测院,云南昆明650216 [5]自然资源部高原山地地质灾害预报预警与生态保护修复重点试验室,云南昆明650216
出 处:《水力发电》2023年第9期29-34,共6页Water Power
基 金:国家自然科学基金资助项目(41861134008);云南省阿瑟夫汉院士工作站资助项目(202105AF150076);云南省重点研发计划项目(202003AC100002);云南省基础研究计划面上项目(20200-1AT070043)。
摘 要:2016年9月17日,云南省元谋县黄瓜园镇暴发特大山洪泥石流灾害,尤其是雷布大箐暴发力最强、波及面最广、损毁最严重,并在龙川江堆积区形成堰塞体,致使龙川江干流堵塞19 h,严重威胁上游黄瓜园镇的生命财产安全。以雷布大箐泥石流沟为研究对象,通过实地调查和资料整理,分析了泥石流灾害的地质背景及形成条件,采用RAMMS模拟软件进行数值模拟研究,重现泥石流运动过程;根据运动过程模拟结果,对泥石流进行危险性分区,并将模拟结果与实地调查结果对比,两者差异较小,表明模拟分析较为客观,符合实际。On September 17,2016,a major mountain flood and debris flow disaster broke out in Huangguayuan Town,Yuanmou County,Yunnan Province,with being the most powerful,widespread and severely damaged in Leibudaqing,forming a barrier in the accumulation area of Longchuan River,that causing the main stream of Longchuan River to be blocked for 19 hours,seriously threatening the safety of life and property in Huangguayuan Town upstream.Taking Leibudaqing Debris Flow Gully as the research object,the geological background and formation conditions of debris flow disasters are analyzed through field investigation and data collation.The RAMMS simulation software is used for numerical simulation research to reproduce the movement process of debris flow.According to the movement process simulation results,the risk zoning of debris flow is carried out.By comparing the simulation results with the field investigation results,the difference between them is smaller,which indicates that the simulation analysis is objective and in line with the reality.
关 键 词:泥石流 发育特征 运动过程 危险性分区 数值模拟 RAMMS软件 雷布大箐 元谋县 云南省
分 类 号:P642.23[天文地球—工程地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:52.14.230.29