检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王虎强 Wang Huqiang(Dayang Coal Mine Branch of Shanxi Lanhua Scientific Innovation Co.,Ltd.,Jincheng Shanxi 048000,China)
机构地区:[1]山西兰花科创股份有限公司大阳煤矿分公司,山西晋城048000
出 处:《山西冶金》2023年第7期229-230,233,共3页Shanxi Metallurgy
摘 要:随着煤矿开采深度的不断增加,矿井地压也随之增大,在采动影响下,应力将重新分配,造成巷道围岩的挤压变形。对此,大阳煤矿根据3号煤层实际情况,提出了三种底鼓治理方案,最终选择了底板中部切槽+底角锚索的支护方式。经实践证明,底鼓最大形变量24 mm,并在30 d内趋于平稳,取得了较为理想的实践效果。With the continuous increase of coal mining depth,the ground pressure in the mine also increases.Under the influence of mining,stress will be redistributed,causing compression deformation of the surrounding rock of the tunnel.Based on the actual situation of Coal Seam 3,Dayang Coal Mine proposed three types of floor heave treatment plans,and ultimately chose the support method of cutting grooves in the middle of the floor and anchor cables at the bottom corners.Practice has proven that the maximum deformation of the floor heave is 24 mm,and it tends to stabilize within 30 days,achieving ideal practical results.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171