检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李凯 乔卫民 贺丽峰 Li Kai Qiao Weimin He Lifeng(Shanxi Puxian Coal Industry Group Fujia'ao Coal Industry Co.,Ltd.,Shanxi Linfen 041000)
机构地区:[1]山西蒲县煤业集团富家凹煤业有限公司,山西临汾041000
出 处:《山东煤炭科技》2023年第8期43-45,49,共4页Shandong Coal Science and Technology
摘 要:为防止富家凹煤矿11205孤岛工作面运输巷受到邻近11207工作面采空区上覆顶板下沉的动压影响,在进行巷道顶板窥视和现场调研基础上,依据动压影响和围岩松动范围,对巷道采用“分段支护方案+高强预应力全锚索支护”技术。现场施工和后期矿压观测结果表明:该技术方案保证了巷道的稳定和采掘接替。In order to prevent the transportation roadway of the 11205 isolated island working face in Fujia'ao Coal Mine from being affected by the dynamic pressure caused by the subsidence of the goaf overlying roof near the 11207 working face,based on the observation of the roadway roof and on-site investigation,and according to the influence of dynamic pressure and the range of surrounding rock loosening,the "segmented support scheme+high strength prestressed full anchor cable support" technology is adopted for the roadway.The on-site construction and post mining pressure observation results indicate that this technical scheme ensures the stability of the roadway and the replacement of mining and excavation.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171