检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘前进 李玮 LIU Qian-jin;LI Wei(Anhui Urban Construction Design Institute CORP.Ltd.,Hefei 230000,China;Anhui Provincial Architectural Design and Research Institute Co.Ltd.,Hefei 230000,China)
机构地区:[1]安徽省城建设计研究总院股份有限公司,合肥230000 [2]安徽省建筑设计研究总院股份有限公司,合肥230000
出 处:《工程建设与设计》2023年第11期141-143,共3页Construction & Design for Engineering
摘 要:为解决传统模式下工业类建筑各设计环节配合不协同、现场安装管理混乱等问题,以安徽中烟科技研发设施技术改造项目为案例,采用BIM技术进行辅助设计,分析了BIM技术在可视化设计、协同设计等方面的应用成果,并且对应用前景进行探讨。In order to solve the problems of non coordination of various design links and confusion of on-site installation management of industrial buildings under the traditional mode,taking the technical transformation project of Anhui Zhongyan science and technology R&D facilities as an example,BIM Technology is used for auxiliary design,the application achievements of BIM Technology in visual design and collaborative design are analyzed,and the application prospectis discussed.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.66