检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:单青红 SHAN Qing-hong(China Railway 14th Bureau Group Co.Ltd.,Ji'nan 250013,China)
出 处:《工程建设与设计》2023年第11期255-257,共3页Construction & Design for Engineering
摘 要:分析了城市轨道交通工程的施工特点,并结合城市轨道交通工程建设质量标准,调研现阶段城市轨道交通工程各项目的质量现状,并介绍了其相关要求。在此基础上,从工程施工原理、工程开挖技术、深坑支护施工技术、区间隧道施工、给排水系统以及电气系统等技术角度出发,阐述了城市轨道交通的施工技术要点,归纳和总结出了相对应的工程管理要点。This paper analyzes the construction charateristics of urban rail transit engineering,and combined with the urban rail transit engincering construction quality standards,investigates the quality of urban rail transit engineering status at the present stage,and introduces the related requiremnents.On this basis,from the perspective of the technology of engineering construction principle,engineering excavation technology,deep pit support construction technology,interval tunnel construection,water supply and drainage system and electrical system,this paper expounds the key points of the construction tchnology of urban rail tr ansit,and summarizes and summarizes the corresponding key points of engineering management.
分 类 号:U239.5[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38