检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:栾鹏宇 LUAN Pengyu(Qingdao Geo-Engineering Surveying Institute(Qingdao Geological Exploration Development Bureau),Qingdao 266100,China)
机构地区:[1]青岛地质工程勘察院(青岛地质勘查开发局),山东青岛266100
出 处:《中国高新科技》2023年第13期68-70,共3页
摘 要:地质灾害抢险工程作为特殊性的工程,普遍具有工程工期紧、现场情况复杂等特征。在施工过程中,往往需要结合工程实际需求,采取针对性的施工工艺技术方案,以保证地质灾害抢险工程综合效益的提升。文章从该角度入手,以某地质灾害抢险工程为例,对该工程中施工工艺技术的使用问题进行探讨,为同类型工程管理者提供参考。As a special project,the geological disaster rescue project is generally characterized by tight construction period and complex site conditions.In the process of construction,it is often necessary to combine the actual needs of the project and adopt targeted construction process and technical schemes,which can ensure that the comprehensive benefits of the geological disaster rescue project can be improved.From this point of view,taking a geological disaster rescue project as an example,the article discusses the use of construction technology in the project,hoping to give some reference to the same type of project managers.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.194.168