检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王婷 WANG Ting(Wuhu Water Conservancy Project Construction Management Division,Wuhu 241000,China)
机构地区:[1]芜湖市水利工程建设管理处,安徽芜湖241000
出 处:《工程建设与设计》2023年第14期188-190,共3页Construction & Design for Engineering
摘 要:从水文地质勘察、设计、材料采购、施工过程质量控制、后期运维等方面分析了河道堤防工程渗漏的原因,并以长江中下游A工程为例,提出了加强水文地质勘察、防渗技术应用、防渗质量监督管理等防渗措施,实现了对河道堤防工程原因及措施的深入分析。This paper analyzes the seepage causes of river embankment engineering from the aspects of hydrogeological investigation,design,material procurement,construction process quality control,and late operation and maintenance,and takes the A project in the middle and lower reaches of the Yangtze River as an example,puts forward anti-seepage measures such as strengthening hydrogeological investigation,strengthening the application of anti-seepage technology,strengthening the supervision and management of anti-seepage quality,and realizes the in-depth analysis of the causes and measures of river embankment engineering.
分 类 号:TV871.2[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.15.238.90