检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黎春平 LI Chunping(Water and Power Company,Jianghan Petroleum Administration Co.,Ltd.,Qianjiang,Hubei 433123,China)
机构地区:[1]中国石化集团江汉石油管理局有限公司水电分公司,湖北潜江433123
出 处:《江汉石油职工大学学报》2023年第4期59-61,共3页Journal of Jianghan Petroleum University of Staff and Workers
摘 要:通过介绍输配水管网的现状及水平衡测试的实施方案,总结出用报表比对排查、人工排查、仪器监测三种不同方式开展水平衡测试工作所取得的成果。结合水平衡测试工作中遇到的困难,分析目前水平衡测试工作存在的主要问题,同时对如何准确找出输配水管网的泄漏点,及时采取修复措施降低漏损率提出改进措施。This study provides an overview of the current status of the water supply and distribution system in oilfields and presents an execution plan for water balance testing.The results obtained from three different approaches,namely comparative analysis of reports,manual inspection,and instrument monitoring,are summarized.The main challenges encountered during the water balance testing are analyzed,and improvement measures are proposed to accurately identify leakage points in the water supply and distribution system,promptly implement repair measures,reduce instances of leaks,and lower the leakage rate.
分 类 号:TV213.4[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.135.50