作  者:肖鹏飞 赵志高 杨桀彬[2] 刘程鹏 何相慧 杨建东[2] XIAO Pengfei;ZHAO Zhigao;YANG Jiebin;LIU Chengpeng;HE Xianghui;YANG Jiandong(Institute of Science and Technology Research,China Three Gorges Corporation,Beijing 101100,China;State Key Laboratory of Water Resources Engineering and Management,Wuhan University,Wuhan 430072,China)

机构地区:[1]中国长江三峡集团有限公司科学技术研究院,北京市101100 [2]水资源工程与调度全国重点实验室(武汉大学),湖北省武汉市430072

出  处:《水电与抽水蓄能》2023年第4期51-55,共5页Hydropower and Pumped Storage

基  金:博士后创新人才支持计划(BX20220243);国家自然科学基金青年项目(52209114);中国博士后科学基金面上项目(2021M702527)。

摘  要:抽水蓄能机组在极端工况运行时,可能会出现气体释放、空化甚至水柱分离现象,这对抽水蓄能电站工程设计和机组安全稳定运行造成潜在威胁。针对上述工程问题,本文基于有限体积法,将气液相变空化模型应用于气液两相流和水柱分离计算。基于Riemann不变量方程,提出有限体积和特征线耦合计算方法对抽水蓄能机组尾水管空化过程进行了数值模拟,并系统分析了尾水管进口发生空化和水柱分离后的压强变化情况。研究结果表明:压力管道内负压产生的空化和水柱分离可能引起较大升压,对机组稳定运行产生影响。该研究对电站工程设计和机组安全稳定运行有重要意义,同时为水柱分离的数值模拟提供了新的思路。When a pumped storage unit operates under extreme conditions,gas release,cavitation or even water column separation may occur,which poses a potential threat to the engineering design of the pumped storage power plant and the safe and stable operation of the unit.In view of the above engineering problems,based on the finite volume method,the cavitation model of gas-liquid phase change is applied to the calculation of gas-liquid two-phase flow and water column separation(WOS).Based on the Riemann invariant equation,a finite volume and characteristic line coupling calculation method was proposed to numerically simulate the cavitation process of the draft tube of the pumped storage unit,and the pressure change after cavitation and liquid column separation at the draft tube inlet was systematically analyzed.The research results show that the cavitation and liquid column separation caused by the negative pressure in the pressure pipeline may cause a large increase in pressure,which will affect the stable operation of the unit.This research is of great significance to the engineering design of the power station and the safe and stable operation of the unit,and at the same time provides a new idea for the numerical simulation of water column separation.

关 键 词:抽水蓄能电站 过渡过程 数值模拟 水柱分离 

分 类 号:TV743[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象