检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈帅 Chen Shuai(China Railway First Bureau Electricity Company,Xi'an Shaanxi 710000,China)
机构地区:[1]中铁一局集团电务工程有限公司,陕西西安710000
出 处:《机械管理开发》2023年第8期176-178,共3页Mechanical Management and Development
摘 要:城市轨道交通供电工程中接触轨安装的合理性、供电过程的完整性是保证施工单位完成施工工作的基本要求,是列车安全运营的基本前提条件。城市轨道交通“热滑”试验是检验接触轨安装的合理性、供电过程的完整性的必要手段,通过图像采集、定位、软件分析等方式,实现了热滑试验的数据和过程准确率,极大地提升了热滑试验效率。The rationality of contact rail installation and the integrity of the power supply process in urban rail transit power supply projects are the basic requirements for the construction unit to complete the construction work and the basic prerequisite for the safe operation of trains.The"hot slip"test of urban rail transit is a necessary means to verify the rationality of the contact rail instllation and the integrity of the power supply process.In this study,the data and process accuracy of the thermal slip test were achieved through image acquisition,positioning,and software analysis,which greatly improved the efficiency of the thermal slip test.
分 类 号:U284.48[交通运输工程—交通信息工程及控制]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15