基于PLC的煤矿供热锅炉自动监控系统的设计  被引量:3

Design of PLC-based Automatic Monitoring System for Coal Mine Heating Boilers

在线阅读下载全文

作  者:李连芳 Li Lianfang(Majiliang Mine,Jinneng Holding Coal Group,Datong Shanxi 037000,China)

机构地区:[1]晋能控股煤业集团马脊梁矿,山西大同037000

出  处:《机械管理开发》2023年第8期223-225,共3页Mechanical Management and Development

摘  要:为保障煤矿供热锅炉的安全、稳定、高效运行,以可编程控制器PLC为基础,为煤矿供热锅炉设计了一种自动监控系统。介绍了该监控系统的控制原理,设计了该监控系统的整体结构,并重点设计了水位监控模块与炉膛监控模块。实际应用结果表明,该系统可对锅炉运行情况进行远程自动监测与控制,有助于进一步提高锅炉运行的自动化、智能化水平,保障了煤矿供热锅炉的安全高效运行。In order to ensure the safe,stable and efficient operation of coal mine heating boilers,an automatic operation monitoring system is designed for coal mine heating boilers based on a programmable controller PLC.The practical application results show that the application of the system can automatically detect and control the boiler operation remotely,which helps to further improve the automation and intelligence level of boiler operation and ensure the safe and efficient operation of coal mine heating boilers.

关 键 词:PLC 煤矿 供热锅炉 监控系统 

分 类 号:TD76[矿业工程—矿井通风与安全]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象