作 者:杨磊 Yang Lei(Yangquan Coal Industry Group Qiyuan Coal Industry Limited Liability Company,Shouyang Shanxi 045400,China)
机构地区:[1]阳泉煤业集团七元煤业有限责任公司,山西寿阳045400
出 处:《机械管理开发》2023年第8期275-277,共3页Mechanical Management and Development
摘 要:综采工作面巷道的快速掘进成巷作业是确保煤矿高效安全开采的前提,为实现大断面巷道的快速掘进作业,确保巷道开挖后的稳定性,对开挖后的大断面巷道应用超前临时支护系统进行锚固。通过现场应用发现,该超前临时支护系统可有效缓解巷道的变形,最大顶底板移近量控制在150 mm,支护效果较好,与原有支护设计相比巷道开挖速率也得到明显提高。The fast tunneling operation of the roadway of the comprehensive mining face is a prerequisite for ensuring efficient and safe mining in coal mines.In order to achieve the fast tunneling operation of the large section roadway and ensure the stability of the roadway after excavation,the over-the-top temporary support system is applied to anchor the large section roadway after excavation.Through field application,it was found that the overrunning temporary support system can effectively alleviate the deformation of the roadway,and the maximum top and bottom slab shifting into 150 mm,which is a good support effect,and the excavation rate of the roadway has been significantly improved compared with the original support design.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.59.91.46