城市高架预制节段箱梁拼装施工技术分析  被引量:1

Analysis of Construction Technology for Prefabricated Segmental Box Girders Assembling in Urban Elevations

在线阅读下载全文

作  者:刘燕波 Liu Yanbo(China Gezhouba Group Construction Engineering Co.Ltd.,Kunming,Yunnan 650217)

机构地区:[1]中国葛洲坝集团建设工程有限公司,云南昆明650217

出  处:《江西建材》2023年第5期287-289,共3页Jiangxi Building Materials

摘  要:文中以40m城市高架节段箱梁拼装架设施工技术为背景,就短线法预制、架桥机选型、测量控制、垫石及支座安装、吊装拼接、涂胶及临时张拉、永久张拉、压浆封锚及落梁等工序,以及线性控制措施进行了详细阐述,为类似工程施工提供技术参考。With 40m urban elevated segmental box girder assembly construction technology as background,this article provides detailed explanations of the prefabrication process of segmental box girder with short bed match mast method,bridge girder erection machine selection,measurement control,bearing pad stone and support installation,hoisting and splicing,gluing and temporary tensioning,steel strand tensioning,grouting anchoring,and lowering of girder,as well as linear control measures,providing technical references for similar project construction.

关 键 词:城市高架 预制节段箱梁 拼装架设 施工技术 

分 类 号:U445.4[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象