检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:严贵善 祁天明 陈显毅 YAN Guishan;QI Tianming;CHEN Xianyi(Tibet Yulong Copper Industry Co.,Ltd.,Changdu,Tibet 854000,China)
机构地区:[1]西藏玉龙铜业股份有限公司,西藏昌都854000
出 处:《自动化应用》2023年第16期179-181,共3页Automation Application
摘 要:采剥工程量是衡量采剥作业成绩的重要指标,也是采剥工程款结算的重要依据和保障。露天矿山常用的采剥工程量验收计算方法包括断面法、方格网法、三角网法等。本文通过分析和对比玉龙铜矿采剥工程量的几种计算方法,结合数字矿山软件“DIMINE”的三维实体建模功能,实现了采剥工程量计算精度的优化,提高了内业计算工作效率,为后续工作的开展提供了可靠的数据图纸资料。The amount of mining and stripping is a very important index to evaluate the results of mining and stripping operations,and it is also an important basis and guarantee for the payment of mining and stripping projects.The acceptance calculation methods for mining and stripping quantities in open pit mines include section method,grid method and triangulation method.In this paper,through the analysis and comparison of calculation methods of several Yulong copper mining and stripping quantity of the function of 3D modeling combined with the software of“Digital mine DIMINE”,to realize the optimization of mining engineering volume calculation accuracy,improve work efficiency and calculation within the industry,for the follow-up development of reliable data to provide data drawings.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.210.23