云南省某水库帷幕灌浆施工及效果分析  被引量:3

Curtain Grouting Construction and Effect Analysis of a Reservoir in Yunnan Province

在线阅读下载全文

作  者:张程 ZHANG Cheng(Shanxi Water Conservancy and Hydropower Project Construction Supervision Co.,Ltd,Taiyuan 030012,China)

机构地区:[1]山西省水利水电工程建设监理有限公司,山西太原030012

出  处:《海河水利》2023年第8期60-63,共4页Haihe Water Resources

摘  要:岩溶区坝基渗透稳定的控制对水库稳定安全运行有重要意义。以云南省某水库坝基为实例,针对其存在的岩溶渗漏问题,采取帷幕灌浆的工程处理措施。在帷幕灌浆布置的基础上,通过灌后检查孔来检验灌浆质量,采用透水率与单位注入量的相关性变化来评价灌浆效果。结果表明,该帷幕灌浆方案的灌浆效果良好,能满足工程帷幕防渗要求。研究成果可供类似工程参考借鉴。The control of seepage stability of dam foundation in karst areas is significant to the safe and stable operation of reservoir.Taking a dam foundation of a reservoir in Yunnan Province as an example,the engineering treatment measures of curtain grouting are taken to solve the karst leakage problem.On the basis of curtain grouting arrangement,the quality of grouting is tested by checking the hole after grouting,and the effect of grouting is evaluated by the correlation between water permeability and unit injection amount.The results show that the curtain grouting scheme has good grouting effect and can meet the requirements of anti-seepage of project curtain.The research results of this paper can be used for reference for similar projects.

关 键 词:帷幕灌浆 灌浆效果 防渗 水库 云南省 

分 类 号:TV543.5[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象