检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李剑[1,2,3] 李永乐 谢正正[3,4] 张农 郭丰 林学贞[6] 陈清华 LI Jian;LI Yongle;XIE Zhengzheng;ZHANG Nong;GUO Feng;LIN Xuezhen;CHEN Qinghua(Xuzhou Mining Group Co.,Ltd.,Xuzhou 221006,China;Jiangsu Guoneng Deep Well Safety Mining Technology Co.,Ltd.,Xuzhou 221006,China;Key Laboratory of Deep Coal Resource Mining,Ministry of Education,China University of Mining and Technology,Xuzhou 221116,China;School of Mines,China University of Mining and Technology,Xuzhou 221116,China;School of Civil Engineering,Xuzhou University of Technology,Xuzhou 221018,China;Shandong Yanxin Mining Material Processing Co.,Ltd.,Xintai 271299,China)
机构地区:[1]徐州矿务集团有限公司,江苏徐州221006 [2]江苏国能深井安全开采科技有限公司,江苏徐州221006 [3]中国矿业大学深部煤炭资源开采教育部重点实验室,江苏徐州221116 [4]中国矿业大学矿业工程学院,江苏徐州221116 [5]徐州工程学院土木工程学院,江苏徐州221018 [6]山东焱鑫矿用材料加工有限公司,山东新泰271299
出 处:《煤矿安全》2023年第8期65-72,共8页Safety in Coal Mines
基 金:国家自然科学基金资助项目(52104104)。
摘 要:为解决深埋复合顶板巷道围岩大变形的问题,以新安煤矿3205工作面材料巷为工程背景,采用现场分析与UDEC数值模拟相结合的手段,分析了复合顶板巷道变形破坏特征及其影响因素,基于巷道顶板厚层锚固原理,提出了跨界锚注分级连续化支护技术方案,通过现场监测和模拟结果验证了新方案的可行性。研究表明:初期支护强度对巷道的维控至关重要,优化后的支护方案有效控制了巷道围岩变形,顶板及两帮变形量分别降低了64%和63%;并且大幅抑制了围岩裂隙发育,最大裂隙深度由9.56 m降低至3.26 m;新支护方案构建了顶板厚层稳固的锚固岩梁结构,可以维持巷道长期稳定承载。To solve the problem of large deformation of roadway with deep composite roof,based on the material roadway of 3205 working face in Xin'an Coal Mine as the engineering background,the deformation and failure characteristics of roadway with composite roof and its influencing factors were analyzed by combining field analysis and UDEC numerical simulation.Based on the principle of thick layer anchoring of roadway roof,a technical scheme of graded continuous cross-boundary anchoring was proposed.The feasibility of the new scheme is verified by field monitoring and simulation results.The results show that the initial support strength is very important for roadway maintenance.The optimized support scheme can effectively control the deformation of roadway surrounding rock,and the deformation of roof and two sides is reduced by 64% and 63% respectively.The maximum crack depth decreased from 9.56 m to 3.26 m.The new support scheme constructs the anchor rock beam structure with thick and stable roof,which can maintain the long-term stable bearing capacity of the roadway.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.139.239.16