检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈国志 CHEN Guo-zhi(China Three Gorges Renewable(Group)Co.,Ltd.,Beijing 100761,China)
机构地区:[1]中国三峡新能源(集团)股份有限公司建设管理分公司,北京100761
出 处:《云南水力发电》2023年第9期60-66,共7页Yunnan Water Power
摘 要:按政府审批规定完成风电场项目手续办理是项目依法合规落地的唯一途径。风电场项目开发建设和验收手续事务复杂并涉及面广泛,需要学习大量的法律、法规和风电场综合知识,需具备多方面的专业知识、沟通交流技巧和能力,了解掌握政府对行业的政策和信息要多,解决问题的思路要开扩,对开发建设人员的综合素质要求非常高。围绕山地风电场项目建设实际,重点介绍风电场项目开发建设和验收主要手续办理的思路与方法。Completing the procedures for wind farm projects in accordance with government approval regulations is the only way for projects to be implemented in accordance with the law and regulations.The development,construction,and acceptance procedures of wind farm projects are complex and involve a wide range of aspects.Construction personnel need to learn a lot of laws,regulations,and comprehensive knowledge of wind farms.They need to possess various professional knowledge,communication skills,and abilities,understand and master government policies and information on the industry,and expand their problem-solving thinking.Therefore,it requires very high comprehensive quality of development and construction personnel.This article focuses on the actual construction of mountain wind farm projects,focusing on the ideas and methods for handling the main procedures for the development,construction,and acceptance of wind farm projects.
分 类 号:TK8[动力工程及工程热物理—流体机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.226.166.121