莫莫克水库进场T型桥梁施工架设  

Construction andErection of T-shaped Bridge for Mobilization of Momoke Reservoir

在线阅读下载全文

作  者:石育铭[1] SHI Yu-ming(Xinjiang Institute of Water&Hydropower Engineering Investigation,Design and Research Co.,Ltd.,Urumqi 830000,China)

机构地区:[1]新疆水利水电勘测设计研究院有限责任公司,新疆乌鲁木齐830000

出  处:《云南水力发电》2023年第9期213-215,共3页Yunnan Water Power

摘  要:大跨度超重量装配式预应力钢筋混凝土T型简支梁运输、吊装、转运、架设均是施工中的重点项目,介绍了35m长120t重的装配式预应力钢筋混凝土T型简支梁的运输、吊装、转运、架设等具体施工操作过程,提出了施工注意事项。Transportation,hoisting,transportation,and erection of large-span and ultra weight prefabricated prestressed reinforced concrete T-shaped simply supported beams are key projects in construction.This paper introduces the specific construction process of transportation,lifting,transportation,and erection of a prefabricated prestressed reinforced concrete T-shaped simply supported beam with a length of 35m and a weight of 120t,and proposes construction precautions.

关 键 词:莫莫克水库 装配式预应力钢筋混凝土T型简支梁 桥梁架设 施工事项 

分 类 号:U445.4[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象