检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:石育铭[1] SHI Yu-ming(Xinjiang Institute of Water&Hydropower Engineering Investigation,Design and Research Co.,Ltd.,Urumqi 830000,China)
机构地区:[1]新疆水利水电勘测设计研究院有限责任公司,新疆乌鲁木齐830000
出 处:《云南水力发电》2023年第9期213-215,共3页Yunnan Water Power
摘 要:大跨度超重量装配式预应力钢筋混凝土T型简支梁运输、吊装、转运、架设均是施工中的重点项目,介绍了35m长120t重的装配式预应力钢筋混凝土T型简支梁的运输、吊装、转运、架设等具体施工操作过程,提出了施工注意事项。Transportation,hoisting,transportation,and erection of large-span and ultra weight prefabricated prestressed reinforced concrete T-shaped simply supported beams are key projects in construction.This paper introduces the specific construction process of transportation,lifting,transportation,and erection of a prefabricated prestressed reinforced concrete T-shaped simply supported beam with a length of 35m and a weight of 120t,and proposes construction precautions.
关 键 词:莫莫克水库 装配式预应力钢筋混凝土T型简支梁 桥梁架设 施工事项
分 类 号:U445.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.229.52