某水电站机组运行工况对尾水隧洞淤积物存量的影响  

Influence of Operating Conditions of a Hydropower Station Unit on the Accumulation of Sediment in Tailrace Tunnel

在线阅读下载全文

作  者:程乾乾 刘碧武 曹泽昊 田金 郭超 唐祥宇 CHENG Qian-qian;LIU Bi-wu;CAO Ze-hao;TIAN Jin;GUO Chao;TANG Xiang-yu(Yalong River Hydropower Development Company.Ltd.,Chengdu 610051,China)

机构地区:[1]雅砻江流域水电开发有限公司,成都610051

出  处:《云南水力发电》2023年第9期275-277,共3页Yunnan Water Power

摘  要:介绍了某水电站运行过程中发现的尾水隧洞砂、石淤积问题,利用近年淤积物清理数据结合机组运行时长、总发电负荷、开停机周期等方面分析机组工况对淤积物存量的影响,并针对性提出运行控制措施,旨在降低尾水隧洞砂、石淤积的不利因素,为电站检修工作顺利开展提供有力保障,为后续安全生产打下坚实基础。This paper introduces the problem of sand and stone deposition in the tailrace tunnel discovered during the operation of a certain hydropower station.It analyzes the influence of unit operating conditions on the deposit stock by using the sediment cleaning data in recent years in combination with the unit operating time,total power generation load,startup and shutdown cycle,and puts forward targeted operation control measures.The aim is to reduce the adverse factors of sand and stone deposition in the tailrace tunnel,provide strong guarantees for the smooth operation of power plant maintenance work,and lay a solid foundation for subsequent safety production.

关 键 词:尾水隧洞 淤积物 运行工况 有效措施 

分 类 号:TV672.1[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象