出 处:《China Oil & Gas》2023年第3期63-64,共2页中国油气(英文版)
摘 要:China’s longest deep-water oil and gas pipeline enters commissioning phase.On June 24,2023,a long-distance submarine pipeline of 20 inches in diameter,as a crucial control project of the second phase of the“Deep Sea No.1”ultra-deepwater gas field,entered its commissioning phase.It will be connected to the subsea production system,laying a foundation for the full-line operation of the pipeline.The pipeline was completed on June 22,with a total length of 115.5 kilometers and made up of 9,425 sections of steel pipe.As the longest deep-water oil and gas pipeline in China,it will serve as the main conduit for transporting oil and gas for the second phase of the“Deep Sea No.1”project.
关 键 词:SUBMARINE PIPELINE COMMISSION
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.162.109