作 者:杨庆龙 YANG Qing-long(CHN Energy Baoqing Coal Electrochemical Co.,Ltd.Chaoyang Open Pit Coal Mine,Shuangyashan 155600,China)
机构地区:[1]国能宝清煤电化有限公司朝阳露天煤矿,双鸭山155600
出 处:《价值工程》2023年第25期72-74,共3页Value Engineering
摘 要:本文论述了井筒注浆堵水工艺及其技术方法,本次注浆为二次注浆施工难度大,通过对井筒壁后实施钻孔注浆的施工工艺,有效封堵了井壁后涌水,将注浆施工前井筒涌水量5.2m3/h,降为施工后涌水量为0.98 m3/h,堵水效果显著。该方案可以治理裂缝错综复杂、渗水点较散乱的立井水患,为同类地质条件下立井井筒注浆堵水提供借鉴。This article discusses the process and technical methods of wellbore grouting for water blocking.This grouting is a secondary grouting,which is difficult in construction.By implementing the construction process of drilling and grouting behind the wellbore wall,the water inflow behind the wellbore was effectively blocked.The water inflow before grouting construction was reduced to 5.2m3/h,and the water inflow after construction was reduced to 0.98m3/h.The water blocking effect is significant.This plan can control the complex cracks and scattered water seepage points in vertical wells,providing reference for grouting and water blocking in vertical shafts under similar geological conditions.
分 类 号:TD743[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.59.212.110