顶管施工项目主要危险因素及引发路面沉降量计算  被引量:3

Main Risk Factors and Calculation of Road Surface Settlement Induced by Pipe Jacking Construction Projects

在线阅读下载全文

作  者:符秀江 王思长[2,3] 王子健 蒋铧隆[2] FU Xiu-jiang;WANG Si-chang;WANG Zi-jian;JIANG Hua-long(Hainan Highway Administration,Haikou 570100,China;School of Civil Engineering and Architecture,Chongqing University of Science and Technology,Chongqing 401331,China;Chongqing Key Laboratory of Energy Engineering Mechanics&Disaster Prevention and Mitigation,Chongqing 401331,China)

机构地区:[1]海南省公路管理局,海口570100 [2]重庆科技学院建筑工程学院,重庆401331 [3]能源工程力学与防灾减灾重庆市重点实验室,重庆401331

出  处:《价值工程》2023年第25期147-149,共3页Value Engineering

基  金:重庆市自然科学基金(面上项目)(CSTB2023NSCQ-MSX0208);重庆科技学院2022年硕士研究生创新计划项目(YKJCX2220643)。

摘  要:顶管施工作为一种常见的管道施工方法,因其非开挖或少开挖施工等优势,在城市基础设施建设中得到广泛应用。然而,顶管施工项目存在着一定的风险和挑战,施工过程中常常会引发地面沉降。本文针对海南省某一体化项目,通过对顶管施工项目风险的分析,应用peck法经验公式计算了路面沉降量。结果表明,顶管施工穿越段引发的路面沉降满足要求。研究结果可有效指导工程施工,并为顶管施工引起的地表沉降控制措施提供参考。Pipe jacking construction,as a common method for pipeline installation,has been widely used in urban infrastructure development due to its advantages of non-excavation or limited excavation.However,pipe jacking construction projects come with certain risks and challenges,often leading to ground settlement during the construction process.In this study,focusing on an integrated project in Hainan Province,the risks associated with pipe jacking construction were analyzed,and the settlement of the road surface was calculated using the empirical formula of Peck's method.The results indicate that the road surface settlement induced by the pipe jacking construction meets the requirements.The findings of this research can effectively guide engineering construction and provide references for controlling surface settlement caused by pipe jacking construction activities.

关 键 词:顶管施工 工艺流程 主要危险因素 路面沉降计算 Peck法 

分 类 号:TU990.3[建筑科学—市政工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象