检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴勇 李鹏 卢永存 张俊弘 何磊 WU Yong;LI Peng;LU Yong-cun;ZHANG Jun-hong;HE Lei(Sichuan Yanjiang Panning Expressway Co.Ltd.,Panzhihua 617000,China;Sichuan Jiaoda Engineering Testing Consulting Co.Ltd.,Chengdu 610031,China)
机构地区:[1]四川沿江攀宁高速公路有限公司,四川攀枝花617000 [2]四川交大工程检测咨询有限公司,成都610031
出 处:《工程建设与设计》2023年第15期179-181,共3页Construction & Design for Engineering
摘 要:宁会隧道在穿越复杂山区突遇涌水。经过分析涌水量监测数据,并综合运用物探、钻探等探测方法,明确了岩溶形态和位置,证实了降水对洞内涌水的补给。为减少涌水突泥事故不利影响,提出了迂回左线施工的后期施工方案,提高了右洞停工时的隧道施工进度。Ninghui Tunnelen countered water in rush through complex mountainous areas.Through the analysis of water in flow monitoring data,and the integrated use of geophysical exploration,drilling detection methods,the karst morphology and location are clarified,and the recharge of precipitation to water inrush in the tunnel is confirmed.In order to reduce the adverse effects of water inrushing,the late construction scheme of circuitous left line construction is proposed,which improves the construction progress of the right tunnel when the right tunnel is shut down.
分 类 号:U457.2[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.63