检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:阮莹 唐清 李凯明 RUAN Ying;TANG Qing;LI Kaiming(Guangzhou Metro Design&Research Institute Co.,Ltd.,Guangzhou 510010;Guangzhou Transport Planning Research Institute Co.,Ltd.,Guangzhou 510030)
机构地区:[1]广州地铁设计研究院股份有限公司,广州510010 [2]广州市交通规划研究院有限公司,广州510030
出 处:《都市快轨交通》2023年第4期130-135,共6页Urban Rapid Rail Transit
摘 要:为研究广州地铁3号线未来客流演变趋势和客流压力缓解办法,首先分析3号线现状客流特征,从运输组织层面探讨3号线Y型交路方案优化的可能性,然后立足线网规划中提出的3号线、10号线拆解改造的设想,基于广州市交通模型分析未来几年不同轨网供给条件下不拆解情形、拆解情形两种运输形式对客流的影响。结果表明:当前3号线客流压力在运输组织层面优化空间较小,不拆解情形下3号线未来几年仍将面临较大的客流压力,北延线最大断面满载率将达140%以上,体育西路最大换乘量将超过60万人次/d,但随着平行线路近期的陆续开通,客流压力将得到缓解;若3号线拆解,北段运能提升,高峰断面客流压力得到快速缓解,体育西路最大换乘量亦将低于疫情前的最大值,但拆解期间有一定负面影响。应综合考虑拆解前后客流影响和施工期间的社会影响,决定3号线未来是否拆解改造。This work aims to explore the future trends in passenger flow and methods of relieving congestion on Guangzhou Metro Line 3.Initially,the paper examines the current passenger flow characteristics of Line 3 and contemplates the potential for optimizing its Y-shaped traffic plan from a transportation organization perspective.Then,considering the proposed ideas for disassembling Line 3 and Line 10 in the network planning,the paper analyzes the effect of potentially disassembling Line 3 on passenger flow under various future rail network supply conditions,using the Guangzhou Urban Transit Model.The findings reveal that(1)Presently,the passenger flow pressure on Line 3 has little scope for optimization at the transportation organization level.In a non-disassembly scenario,Line 3 is projected to continue facing high passenger flow pressure in the upcoming years.The maximum section full load rate of Line 3's north extension line could surpass 140%,and the maximum transfer volume at Tiyu Xilu Station may exceed 600,000 passengers/day.However,the passenger flow pressure should gradually lessen with the forthcoming opening of parallel lines.(2)If Line 3 were to be disassembled,it would enhance the transport capacity of its northern section,quickly alleviate peak section passenger flow pressure,and the maximum transfer volume at Tiyu Xilu Station would also be lower than the maximum before the COVID-19 epidemic.However,there might be negative effects during the disassembly period.Therefore,the work proposes to thoroughly assess the passenger flow impact pre and post disassembly,as well as the social impact during disassembly,in order to determine whether a future disassembly and reconstruction of Line 3 is viable.
分 类 号:U231[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249