基于V2G负荷反馈修正的电热氢综合能源系统多层协调优化调度  被引量:12

Multi-layer Coordinated Optimal Dispatch of Electric-Thermal-Hydrogen Integrated Energy System Based on V2G Load Feedback Correction

在线阅读下载全文

作  者:贾士铎 康小宁[1] 黑皓杰 鲍珏龙 杨韵彰 崔金旭 JIA Shiduo;KANG Xiaoning;HEI Haojie;BAO Juelong;YANG Yunzhang;CUI Jinxu(Shaanxi Key Laboratory of Smart Grid(Xi'an Jiaotong University),Xi'an 710049,China)

机构地区:[1]陕西省智能电网重点实验室(西安交通大学),陕西省西安市710049

出  处:《电力系统自动化》2023年第15期100-110,共11页Automation of Electric Power Systems

基  金:国家自然科学基金中英国际合作研究项目(52061635105)。

摘  要:含电动汽车和氢燃料电池汽车的综合能源系统可以实现多能协调互补,有效推动“双碳”目标的实现,但车辆出行计划的临时变动会对系统带来不利影响。为此,提出了包含对车联网(V2G)负荷反馈修正的电热氢综合能源系统多层协调优化策略。基于3层优化的协调配合,电动汽车充放电管理层综合考虑负荷曲线方差和车主不满意度,制定充放电计划并传递给模型预测控制滚动优化层。在滚动优化过程中,实时识别非计划车辆数,自主运行车联网负荷反馈修正层,从而消除车辆出行计划临时改变所带来的不利影响。仿真结果表明,所提策略在实现车主与运营商双赢的同时,提高了系统运行经济性并改善了主网联络线计划值跟踪情况。The integrated energy system including electric vehicles(EVs)and hydrogen fuel cell vehicles(FCVs)can achieve multienergy coordination and complementarity,and effectively promote the realization of the"carbon emission peak and carbon neutrality"goal,but temporary changes in vehicle travel plans have adverse effects on the system.Therefore,a multi-layer coordinated optimal strategy for the electric-thermal-hydrogen integrated energy system including the load feedback correction of the vehicle to grid(V2G)is proposed.Based on the coordination and cooperation of three-layer optimization,the charging and discharging management layer of EVs comprehensively considers the variance of the load curve and the dissatisfaction of EV owners,formulates charging and discharging plans and transmits them to the rolling optimization layer of model predictive control.In the rolling optimization process,the number of unplanned vehicles is identified in real time,and the V2G load feedback correction layer is operated independently,so as to eliminate the adverse effects of temporary changes in vehicle travel plans.The simulation results show that the proposed strategy not only achieves a win-win situation between car owners and operators,but also improves operational economy of the system and improves the track results of the planned power flow of the main grid tie-line line.

关 键 词:电动汽车 氢燃料电池汽车 综合能源系统 协调优化 多目标改进麻雀搜索算法 

分 类 号:TM73[电气工程—电力系统及自动化] TK01[动力工程及工程热物理]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象