作 者:刘志军 LIU Zhijun(Project Management Department of Sanmen Project Department of China Nuclear Power Engineering Co.,Ltd.,Taizhou 317100,China)
机构地区:[1]中国核电工程有限公司三门项目部工程管理部,浙江台州317100
出 处:《电工技术》2023年第15期241-243,共3页Electric Engineering
摘 要:为更好地完成220 kV及500 kV倒送电任务,福清核电华龙1号机组建设前期,工程管理人员在开工前期梳理了220 kV及500 kV系统上游设计、设备到货及施工逻辑相关制约,逐条制定了应对措施,并按照主工程建设进度需求顺利完成了220 kV及500 kV系统倒送电工作。现对福清核电华龙一号机组220 kV及500 kV倒送电施工难点及解决方法进行总结,以期对类似相关机组电源系统建设提供参考。In order to better complete the 220 kV and 500 kV reverse power supply tasks,in the early stage of Hualong One unit construction of Fuqing nuclear power plant,project management personnel sorted out the constraints related to the upstream design of 220 kV and 500 kV systems,equipment arrival and construction logic,and formulated countermeasures one by one.In accordance with the requirements of the construction schedule of the main project,the inverted power supply of 220 kV and 500 kV systems has been successfully completed.Now,the construction difficulties and solutions of 220 kV and 500 kV inverted power supply of Hualong No.1 unit in Fuqing nuclear power plant are summarized in order to provide reference for the construction of power supply systems of similar units.
分 类 号:TM623[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.219.241.228