检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吉英华 张华义 陈峰 Ji Yinghua;Zhang Huayi;Chen Feng(Coal Quality Center,Henan Energy Yongmei Company,Shangqiu 476600,China;Cheji Coal Mine,Henan Longyu Energy Co.,Ltd.,Shangqiu 476600,China)
机构地区:[1]河南能源永煤公司煤质中心,河南商丘476600 [2]河南龙宇能源股份有限公司车集煤矿,河南商丘476600
出 处:《煤矿机械》2023年第9期139-140,共2页Coal Mine Machinery
摘 要:分析车集煤矿选煤厂生产工艺中煤泥水处理存在的瓶颈问题,提出脱粉入洗的改造方案,研究波纹挡边带式输送机的工作原理及结构特点,选择1400 mm带宽的波纹挡边带式输送机并90°输送物料,解决了垂直运输物料的难题,降低了设备投资和工程造价,减少了占地面积。Analyzed the bottleneck problem of coal slurry treatment in the production process of Cheji coal mine coal preparation plant,put forward the transformation plan of de-pulverizing and washing,studied the working principle and structural characteristics of the corrugated rib belt conveyor,and selected the 1400 mm wide corrugated rib belt conveyor and transports materials at 90°,which solves the problem of vertical transporting material,reduces the equipment investment and project cost,and reduces the floor area.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49